The house is painted but I still need to do some trim painting on the rain gutters and down spouts and also the doors.
Thursday all day was sanding and priming all the bare spots. Friday morning we taped the windows in the front of the house and the doors. Using high pressure air we blew off all the surfaces to be painted to get rid of sanding dust and spiders.
We started spraying at 11 AM and finished the first coat at 3 PM including a stop for lunch. A final light coat was applied in about 45 minutes. There should be 3 coats of paint on all the stucco and eaves. While the spraying was ongoing, I completed taping the remaining windows and doors in the back of the house.
This morning I did the trim around the patio room windows but didn’t like the result so later I did all the window trim in the off white we used for the fascia boards. It really made the white window frames POP!
We reinstalled the rain gutter at the back of the garage and then started painting the drip molding and the rain gutters. I finally stopped around 4 PM as my back was giving out from all the twisting and climbing up and down the ladder.
I need to complete the final coat on the rain gutters, down spouts and doors. This I can handle by myself at my leisure.
I didn’t get an pics today as the sun angle was wrong by the time we had the trim painted. I do have some of the prep work and one of our trailer parked next door while we sprayed.