Friday, June 15, 2012

Solar water heat saga.


Location, at Home, CA

The saga of the solar water system goes on.

We ran into a problem with very little hot water coming out of the faucets even if we let the water run for a long time. This of course has caused some consternation among the household members.

After reviewing it for a few days it was decided by the plumber to temporarily add a thermometer to a few of the lines to monitor temperatures over a 24 hour period.

Did I mention that we have a recirculating line to the back of the house (i.e., the bathroom core)? This was installed so that we would have instant hot water for the bathrooms.

The plumber decided to close off the recirculating line while the temperature test was running.

Well, guess what? The water is now hot in all faucets; it just takes time to get hot.

The explanation lies in how the recirculating line is now working when turned on. It seems that the water for the recirculating line is being drawn from the bottom of the water heater tank instead of from the top hot water line.

A fix would be to add a one way valve in the recirculating line to prevent this from happening.

I have called the Solar Company but so far they have not returned my calls. Then again, I haven’t paid them the final payment either.

Thursday, June 7, 2012

Solar water heat, new cell phones, and berries.


Location, at Home, CA

We have had solar water heat since 1984. Actually it was a water pre-heater which feed by convection into our hot water heater. The solar units consisted of two 20 gallon stainless steel tanks each sitting in large “tubs” with a Mylar reflector under each tank and a cover over each unit.

They worked very well with little maintenance. I once replaced a copper flex line which was leaking and lately we had another leak which I did not fix as the covers were cracked and breaking up. I could not find spare parts anywhere so a few weeks ago I removed the units.

I researched several new units which are now much more efficient, and selected one for instillation. It is a single unit on the garage roof and again piped to the water heater as a pre-heater. This system uses propylene glycol as a heating medium to heat the water in a 48 gallon tank on the roof.  

It has taken several days for the instillation which is mostly complete except for cleanup and adding some insulation around the pipes.

This unit also has a rebate from the local gas company and a federal tax write off as well.

Our cell phone contracts were up for renewal and Clyda wanted a phone she could text with. My Droid phone has an unlimited data plan which I want to keep so I needed to renew my contract. We got a package deal for a new Droid Razr Maxx for me and a Samsung phone with keyboard for Clyda. It will take me some time to figure out all the bells and whistles on the Maxx that’s for sure.

I am still picking berries. The freezer is full so I don’t know what we will do with the remaining berries. Today I picked 11 baskets.

Tuesday, May 29, 2012

Dirty job done.


Location, at Home, CA

Another “Dirty Job” out of the way.

It was time for my annual replacement of the sacrificial anode in the water heater. Not only was the anode replacement due but I had other issues with the water heater. For some time while dry camping, the water pump would cycle intermittently. Aggravating at best but no apparent solution until recently.

While camping at Cachuma Lake earlier this month I noticed water dripping from the area of the water heater.  Inspection showed the water coming from the TPV valve which keeps the heater from over pressuring. Sometimes the valve will leak if the “bubble” at the top of the heater has been lost causing excessive pressure. The remedy is to briefly open the TPV valve and let some water out. However, in my case the valve was so corroded that I didn’t think it would reseat itself.

I purchased a new TPV valve and already had a few sacrificial anodes in stock so today I tackled the repair.

For once, I didn’t get deluged with water when I removed the anode as I was smart enough to release the pressure in the lines by opening a faucet at the kitchen sink first.

As the water gushed out it also brought a lot of lime with it. After the water slowed I used a wire with a 90 degree bend in the end to loosen more of the lime and with repeated flushing got most of it out. Some of the chunks were really large.

I installed a new anode and turned the water to the RV back on. When the water started to come out of the TPV valve hole which is at the top of the tank, I turned the source water off and installed the TPV valve. This should give me an air bubble or gap at the top of the tank.

Turning the water back on and purging the air from the lines by opening a kitchen faucet completes the installation. I tested the heater by first turning it on electricity and within a few seconds I could hear the heater element come on. Next I started the water heater on propane and left it heat completely to check that the TPV valve was not leaking. After an hour all looks good.

I picked berries again today and got 11.5 baskets. My largest picking so far this year.

Friday, May 25, 2012

I haven't disapeared.


Location, at Home, CA


No, I haven’t disappeared or blown away but it is very windy today and has been for several days.

Our nice warn weather has disappeared also. It is sunny but only in the 60’s. It will make for a cool Memorial Day weekend.

A quick synopsis of the past month.

The 10 days at Ranchero Visitadores went well. The weather was nice with temps in the 80’s most days with a nice afternoon breeze to keep us cool. After I was through at the gate, I moved the trailer to Lake Cachuma for 3 days. Clyda came up on Friday afternoon and we kicked back for the weekend with a little wine tasting thrown in for good measure.

I must say that there certainly was a lack of campers at the lake. I think the high prices for camping ($45 with FHU) and high gas prices are keeping people away. They may also have been saving for this weekend.

The boysenberries are producing. I have picked between 6 and 9 baskets the last few days. The berries are nice and plump from the late rains we had. Clyda made syrup from one of the pickings and I froze those picked today.

Craig has a few things planted in the garden such as pole beans, zucchini, crookneck squash and peppers. Zucchini and crookneck will be ready to pick in a few days.

Clyda’s planting of radishes in a cardboard box didn’t turn out well as they didn’t grow fast enough and were tough as rocks. I threw all of them in the compost bucket.

On Tuesday I removed the two solar water heating panels from the back of the garage roof. We had a large trash pickup on Wednesday so I managed to get rid of the bulk objects. The units were still serviceable but I could no longer get spare parts so they had to go. I have someone coming after Memorial Day to give me a quote for replacement units. I left all the plumbing in place as it may be useable with the new units.  

I received a call from a friend yesterday offering Clyda and I a job for the summer running a check in station for the Core of Engineers in Oregon. It seems the people who had the job quit. I think they only worked for a few weeks. The pay was quite good and we only had to work 40 hours a week between us. It does rain however. The job ran through September 15th. We have several commitments this summer so it is not practical for us to do it. We might think about doing something like that but I am not sure I could take dealing with the public. I’m not diplomatic enough I guess or just ornery.

Sunday, April 29, 2012

Last minute update.


Location, at Home, CA

While pulling together the things I need for the next 10 days in the back country I managed to watch all of the NBA first round play-off games. Some good and some not so good considering it is the play-offs.

Tomorrow morning I will go over the mountain and mow. Craig will go with me so it should go fast with two of us mowing. He changed out an engine on one of the large heavy mowers he has so that should help with the deep grass.

I need to buy the last groceries tomorrow afternoon. It is mostly fresh veggies and dairy products.

Tuesday afternoon about 2 Pm I will travel to the site with the trailer and stay for the next 10 days. I hope the weather stays nice but I did see the possibility of rain showers later in the week. I hope it is only showers as working in the rain sucks….Not to mention cooking outdoors in the rain.

What will be, will be. I will try to post while I am there but no promises.

Sunday, April 22, 2012


Location, at Home, CA

Another week gone by with not a lot to show for it on my part.

I am slowly getting things organized for my 10 days gate guarding with the Rancheros. I bought some of the canned goods the other day and will buy the remaining just before I start. I have my food and menus planned but there is always the uncertainty of not knowing what I will receive for meat for dinners. Some years I have gotten a whole New York strip all cut into very thin steaks or both cooked and uncooked tri-tip roasts. Last year I received a package of top block steak. Fortunately, there was someone there who knew what it was as I certainly didn’t recognize it. I cut 2 inch steaks and BBQ’ed them which was perfect.

I filled the truck with diesel this week which should be enough to make at least 2 trips over the mountains. I will go up and mow the grass the day before I take the RV up. I do this to get rid of the foxtails growing there. If I don’t mow them, they get in our shoes and socks and make life miserable.

This year I will be by myself on Friday and Saturday as my helper is being used at the other camp for those days. It is not to my liking but that’s beyond my control.

On another subject: everything is blooming right now so here are some photos to enjoy.

Clyda's radish bed in a box.

Navel orange tree blossems.


Lime tree blooming.


Boysenberrys in full bloom.


Bearded iris bed.



California poppies.


There are even some apricots this year.


Cymbidiums blooming.


And of course, our large bougainvilla along the back fence.









Friday, April 13, 2012

RV repairs completed.

Location, at Home, CA
 
Yesterday I finished putting the RV back together.

I had Craig weld up 2 angle iron T brackets. These were bolted to the existing brackets holding the hydraulic tray in place. They are not meant to support the weight of the tray but rather to keep the whole tray from dropping down. The front of the tray now rests on a 2x4 which spans the top of the generator box. This should keep everything in place even with the rough roads here in California.

I still have a hydraulic leak somewhere around the motor and reservoir to check out. Running the rooms out and in a few times should show where the leak is.

Sometime this summer I want to pull the underlayment from the underside of the trailer so I can see what is wrong with the hydraulic cylinder for the living room slide. I suspect that it is a possibly a lubing problem. It means removing the spare tire and lots of self-taping metal screws.

On another note, my taxes are done and off to the government. I did manage to get a little back from both the Federal and State. In this day and age with governments grabbing with both hands to get our hard earned dollars, it probably is a miracle that we got anything back.